Breaking News

DAHIL SA DIKTADOR NA PRESIDENTE, PWEDE NANG MADAAN ANG NLEX HARBOR LINK SEGMENR 10. GREAT JOB!



Department of Public Works and Highways (DPWH) said the North Luzon Expressway (NLEx) Harbor Link Segment 10 will officially open on Tuesday (Feb. 26).DPWH Secretary Mark Villar said once the elevated expressway is opened, the travel time from Circumferential Road 3 (C3) to NLEX will only be 10 minutes. After the final inspection of the 5.65-kilometer elevated toll road.
The NLEx Harbor Link Segment 10 is a P15.55-billion project with private concessionaire NLEX Corp. Aside from the main line connecting Karuhatan, Valenzuela City to C3, Caloocan City, the expressway will also have a 2.6-kilometer spur road from C3 to Radial Road 10 (R10), Navotas City, which will open by the end of the year.
Mr. Villar said they are looking at around a P9 increase in fees at the NLEx open system due to the new segment. At present, toll fees are P45 for Class 1 vehicles, P114 for Class 2 and P136 for Class 3.But he noted that for at least two to three weeks from its opening, motorists can use Harbor Link for free.

Watch the video!






LIKE IT? SHARE WITH YOUR FRIENDS!